Disclaimer: Pretty sure this is a bug but I couldn't figure out what bug report directory to stick it under. Also the last time I was pretty sure it was a bug, it was just a nonsensical mechanic with an explanation. I'm less sure that's what this is, but let's get into it.
I am thoroughly frustrated with this dojo system and at this point I've spent at least two days straight attempting to rebuild it after finding out how the room dependency mechanic actually works, and now I've now run into another problem that doesn't seem to have any solution. I've somehow ended up at a point where my Grand Hall simultaneously relies on the previous two halls as requirements, but also cannot be deconstructed while those prerequisite halls still exist.
The white symbols are rooms that must be deconstructed before the Grand Hall can be deconstructed. I am constantly at my wits end with the whole dojo system, but even after all the trouble it has given me I cannot fathom how this paradoxical bullS#&$ is possible. There are no rooms left to deconstruct in the entirety of my dojo, meaning that the only way to get rid of the rooms I currently have and rebuild would be to create a new clan and lose all of my resources. I understand that DE may not have the resources for a full overhaul of the systems here, but when a significant amount of progression is locked behind... well this, it might be time to untangle that spaghetti code. If there is another way that anybody knows of, please let me know. I'd say I am at a loss, but I was at a loss three days ago. Now loss and I are old lovers and I'm sure at this rate we'll grow old and die together before the clan dojo gets fixed.
Question
DSJeezy
Disclaimer: Pretty sure this is a bug but I couldn't figure out what bug report directory to stick it under. Also the last time I was pretty sure it was a bug, it was just a nonsensical mechanic with an explanation. I'm less sure that's what this is, but let's get into it.
I am thoroughly frustrated with this dojo system and at this point I've spent at least two days straight attempting to rebuild it after finding out how the room dependency mechanic actually works, and now I've now run into another problem that doesn't seem to have any solution. I've somehow ended up at a point where my Grand Hall simultaneously relies on the previous two halls as requirements, but also cannot be deconstructed while those prerequisite halls still exist.
The white symbols are rooms that must be deconstructed before the Grand Hall can be deconstructed. I am constantly at my wits end with the whole dojo system, but even after all the trouble it has given me I cannot fathom how this paradoxical bullS#&$ is possible. There are no rooms left to deconstruct in the entirety of my dojo, meaning that the only way to get rid of the rooms I currently have and rebuild would be to create a new clan and lose all of my resources. I understand that DE may not have the resources for a full overhaul of the systems here, but when a significant amount of progression is locked behind... well this, it might be time to untangle that spaghetti code. If there is another way that anybody knows of, please let me know. I'd say I am at a loss, but I was at a loss three days ago. Now loss and I are old lovers and I'm sure at this rate we'll grow old and die together before the clan dojo gets fixed.
Edited by DSJeezyLink to comment
Share on other sites
9 answers to this question
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now